A technical path.
Not a promise of dates.
Nine phases organize the evolution of Unit CAD. They are development priorities and dependencies, not deadlines, completed deliveries or an announcement of commercial availability.
Build on
the reported base.
The reported CAD base includes solids and parametrics, operation tree with rebuild, extrudes and cuts, surfaces, planes, sheet metal, hems and folds, unfolds and flat patterns, DXF export and assemblies. Advanced relations and 2D detailing are improving. The site does not represent a code audit or testing of these features.
HPS and X-Coil are reported to be existing engines. Their integration into the engineering workflow and voice and text commands is planned, but still requires validation.
Voice. Parametric.
2D detailing.
The MVP is intended to include an operations API, controlled voice and text commands, parametric editing and 2D detailing with preview and undo. Full multidisciplinary integration will be developed in later phases, subject to testing and validation.
Explore the conceptual flow of Unit AIDependencies before
of speed.
- 00Priority / Very high
Diagnosis — assess the existing foundation, integrations and test criteria
Intended deliverable - 01Priority / Very high
AI MVP — operations API, voice and text, parametric editing and 2D detailing with preview and undo
Intended deliverable - 02Priority / High
Core and thermal engineering — living specification, Core, HPS/X-Coil integration and comparison of alternatives
Intended deliverable - 03Priority / High
Libraries and P&ID — connections, functional circuit and instrumentation
Intended deliverable - 04Priority / High
Electrical engineering — diagrams, components and 3D panel
Intended deliverable - 05Priority / High
Layout and structure — assembly, enclosure, base, access and sheet metal
Intended deliverable - 06Priority / High
Piping — AutoRoute, connectivity and line documentation
Intended deliverable - 07Priority / High
Integrated design — multidisciplinary review, manufacturing documentation and change control
Intended deliverable - 08Priority / Evolutive
Evolution — advanced optimization, simulation, new sectors and collaboration subject to demand and validation
Intended deliverable
Universal CAD.
Progressive specialization.
HVAC is the first specialization, not the platform limit. Duct routing, native nesting, thermal break, libraries and datasheets and ERP integration remain planned expansions. Duct routing and piping routing are distinct fronts.
Commercial testing pendingThe phases indicate intended deliverables, not features already available or release dates. Each advance depends on reproducible tests, technical review and validation before commercial release.
What do you want
to create next?
Your experience can help shape what comes next.